1.cast stone lining plate and slot width begins form B=600mm, from 200mm to B=1400mm,
there are two size for Central height of B600、 B800、 B1000.they are H=640mm和H=440mm.but it just has one size H=640mm for B1200、B1400
2.
Use and application range:it is used for transport and distributediffrent Moisture and granularity less than 300mm coals for coal preparation plant
It can be Horizontal and tilt transport. Horizontal transport. can be devided into single layer and double layers, but tilt transport is just for single layer. This series is mainly horizontal transport.
The speed of chain : 0.48m/s、0.76m/s
二、installation notice
1、
if the conveyer is with or without gate,drive frame, nose, tail frame and intermediate slot bracket, etc all must be elevated 30mm cement.the intermediate tank is installed according to sequence number of intermediate tank outside.
2、
The installation should be level, straight.
3、
The chain ring welding mouth should be up.
4、
free run should be 4 hours after installation,the temperature should not be more than 30℃.The machine Should be smooth, no shock, vibration and so on.
5、
The space between intermediate tank and flange can be adjustable by rubber blanket.
use and maintenance
1、 Should adjust tightness good two chain before driving, check all bolts loose phenomenon.
2、
at the begining ,check the bolt and chain before use,
3、
useNo. 1 or 2 sodium calcium base grease for antifriction bearing
4、
Reducer lubrication should be executed according to operating instructions, donot arbitrarily change lubricating oil.
5、
Chain operation such as found in "gone with the wind" phenomenon, is due to the casting slab shop repair rough and tank body caused by the product of coal "blind Angle". For this kind of phenomenon is adjustable flat cast slab or flat link in the chain welding on a piece of 8 * 50 * 100 mm steel plate, and 50 0 Angle to the direction, each welding a piece of 8-10 metres, not included in the, in the design of the user in the use of temporary welding according to the situation.
6、
if the two chains are uneven bearing wear,they will affect normal engagement,you should change the chains.
7、
You should change the chains when the screw does not work well.
8、
take cae of the screw clean.
9、Double transportation, scraper chain scraper assembly (deformed steel) should be positive and negative interval; In a two-way transport, scraper should be about interval assembly, chain in order to prevent the runtime.
type
10、
you can install the sweeper for transport the larger lump coal,gangue and so on.
11、Turn adjusting screw with the tool (round steel Ф 24) solution by the users themselves.
四、use and maintenance for gate
1、
Add the lubricating oil for bearing regularly.
2、
often clean pinion and rack
3、
check the normal engagement for pinion and rack
4、
make sure the gate operate flexibly